2023-08-11 In the Ningbo Fuel Cell Bipolar Plate and Loading Pilot Line Project, the State Nuclear Power Planning and Design Institute Co., Ltd. purchased the complete air-conditioning terminal and split air-conditioning equipment produced by Jiangping for the construction of the plant. Factory air conditioning is optimizing the production environment.