2023-07-27 Before the pulse dust collector unit is put in place, it is necessary to first check the installation drawings to determine the direction of the unit's placement, and check whether there are any inconveniences in installation and maintenance (pay special attention to the access door, electric control box door, etc.), or other equipment and pipelines intersect, so that timely modifications can be made.